221-0026/01 – Precast concrete structures (MtK)
Gurantor department | Department of Structures | Credits | 4 |
Subject guarantor | prof. Ing. Radim Čajka, CSc. | Subject version guarantor | prof. Ing. Radim Čajka, CSc. |
Study level | undergraduate or graduate | Requirement | Compulsory |
Year | 2 | Semester | winter |
| | Study language | Czech |
Year of introduction | 2010/2011 | Year of cancellation | 2020/2021 |
Intended for the faculties | FAST | Intended for study types | Follow-up Master |
Subject aims expressed by acquired skills and competences
After completing this subject, students will be able to understand and apply the following skills and topic areas:
- design and assessment of precast concrete structures;
- fabrication and erection of precast concrete structures.
Teaching methods
Lectures
Individual consultations
Tutorials
Summary
1. Single storey and multi storey prefab halls, space stiffness, static analysis.
2. Prefab plane elements structures, static analysis and assessment of panel buildings.
3. Stiff and hinged joints, static analysis, allowable variation, supports.
4. Static analysis of stiff and hinged joints in frame structures, principles of reinforcing.
5. Bar prefab elements, truss, purlin and column.
6. Prefab panels, design of reinforcement, carrying capacity assessment.
7. Bearing, their function, categories, application, design and assessment.
8. Design and assessment of corbel, indirect supports.
9. Pocket foundation, reinforcement design and assessment.
10. Anchorage and assembling fixture, categories, design and assessment, prefab elements surface roughness.
11. Filigree slabs, static analysis, design and assessment of particular assembly design situation.
12. Composite concrete structures, basic principles of hitching, hitching elements, carrying capacity assessment.
13. Manufacturing, stocking, transit and assembly of prefab elements.
14. Structural composition drawing, and reinforcement drawing, production documentation.
Compulsory literature:
1. EN 1991-1-6 Eurocode 1: Action on structures – Part 1-6: General actions, actions during execution. European standard, 2005.
2. EN 1992-1-1 Eurocode 2: Design of concrete structures – Part 1: General rules and rules for buildings. European standard, 2006.
3. EN 1991-3 Eurocode 1: Action on structures – Part 3: Action induced by cranes and machinery. European standard, 2007.
Recommended literature:
1. Lohmeyer, C. O. G. – Bergmann, H. – Ebeling, K.: Stahlbetonbau. Bemessung – Konstruktion – Ausfuhrung, 7. Auflage, B. G. Teubner Verlag, Wiesbaden 2006.
2. Martin, L. H. – Purkiss, J.A.: Concrete Design to EN 1992, Elsevier 2006.
Way of continuous check of knowledge in the course of semester
tests, semestral project, credit, exam
E-learning
Other requirements
At least 70% attendance in the tutorial. Absence, up to a maximum of 30%, must be excused and accepted by the teacher (the teacher decides the reasonableness of the excuse).
Tasks assigned in tutorial must be hand in within the deadline set by the teacher.
Prerequisities
Co-requisities
Subject has no co-requisities.
Subject syllabus:
1. Single storey and multi storey prefab halls, space stiffness, static analysis.
2. Prefab plane elements structures, static analysis and assessment of panel buildings.
3. Stiff and hinged joints, static analysis, allowable variation, supports.
4. Static analysis of stiff and hinged joints in frame structures, principles of reinforcing.
5. Bar prefab elements, truss, purlin and column.
6. Prefab panels, design of reinforcement, carrying capacity assessment.
7. Bearing, their function, categories, application, design and assessment.
8. Design and assessment of corbel, indirect supports.
9. Pocket foundation, reinforcement design and assessment.
10. Anchorage and assembling fixture, categories, design and assessment, prefab elements surface roughness.
11. Filigree slabs, static analysis, design and assessment of particular assembly design situation.
12. Composite concrete structures, basic principles of hitching, hitching elements, carrying capacity assessment.
13. Manufacturing, stocking, transit and assembly of prefab elements.
14. Structural composition drawing, and reinforcement drawing, production documentation.
Conditions for subject completion
Occurrence in study plans
Occurrence in special blocks
Assessment of instruction