225-0066/09 – Building Constructions II. (PS II.)
Gurantor department | Department of Building Constructions | Credits | 4 |
Subject guarantor | doc. Ing. Jaroslav Solař, Ph.D. | Subject version guarantor | doc. Ing. Jaroslav Solař, Ph.D. |
Study level | undergraduate or graduate | Requirement | Compulsory |
Year | 2 | Semester | summer |
| | Study language | Czech |
Year of introduction | 2013/2014 | Year of cancellation | 2021/2022 |
Intended for the faculties | FAST | Intended for study types | Bachelor |
Subject aims expressed by acquired skills and competences
Collecting of basic knowledges and skills in this branches:
- Horizontal Structures, Projecting and Recessed Structures
- Staircases
- Ramps, elevators
- Floors
- Prefabricated Skeletons
- Monolithic Skeletons
- Prefabricated Objects of Buildings of Housing and Civic Amenities
- Flat Roofs
- Slope Roofs, Trusses, Vaults, Shell Roofs
Comprehension of basic ideas, correlations and its aplication by analysis of the problems.
Teaching methods
Lectures
Tutorials
Summary
Te content focuses on horizontal structures, ceilings, floors, soffits, roofing, stairs and ramps, disposition in structural system of walls and fremes.
Keywords: horizontal structues - ceilings, floors, soffit, flat roof, inclined roof, elevators, ramps, stairs
Compulsory literature:
Recommended literature:
Recommended reading is the same required literature.
Additional study materials
Way of continuous check of knowledge in the course of semester
E-learning
Other requirements
At least 70% attendance at the exercises. Absence, up to a maximum of 30%, must be excused and the apology must be accepted by the teacher (the teacher decides to recognize the reason for the excuse). Tasks assigned on the exercises must be hand in within the dates set by the teacher.
Prerequisities
Subject has no prerequisities.
Co-requisities
Subject has no co-requisities.
Subject syllabus:
1.-3. Horizontal constructions, overhang and recessed constructions
4.-5. Staircases
6. Ramps, elevators
7. Floors
8.-9. Prefab scaffolds
10.-11. Monolithic scaffolds
12. Prefab housing buildings
13. Flat roofs
14. Sloping roofs, bond timbers, arches, vaultings
Conditions for subject completion
Conditions for completion are defined only for particular subject version and form of study
Occurrence in study plans
Occurrence in special blocks
Assessment of instruction