229-0154/10 – Building Services (TZB)
Gurantor department | Department of Building Environment and Building Services | Credits | 4 |
Subject guarantor | Ing. Petra Tymová, Ph.D. | Subject version guarantor | Ing. Petra Tymová, Ph.D. |
Study level | undergraduate or graduate | Requirement | Choice-compulsory type B |
Year | 1 | Semester | winter |
| | Study language | Czech |
Year of introduction | 2009/2010 | Year of cancellation | |
Intended for the faculties | FBI | Intended for study types | Follow-up Master |
Subject aims expressed by acquired skills and competences
Students will acquire knowledge and skills throughout the field of technical building equipment. Gets clear information about how the internal wiring installation in buildings - water, sewer, gas and plumbing units (health technology).
Teaching methods
Lectures
Tutorials
Summary
The subject provides more comprehensive information on the climate of cities, settlements and buildings, hydraulice Pipeline. It also deals with the calculation of internal sewerage, internal gas pipeline, design of installation units, heat sharing, indoor climate of buildings, home heating sources, air conditioning, ventilation and air conditioning. The course deepens the knowledge about energy performance of buildings and introduces new technologies (use of non-traditional energy sources).
Compulsory literature:
G.J. Blower: Plumbing Mechanical Services, Essex/2006
Recommended literature:
John Canivan: How to Build a Solar Hot Water System, Sunny Future Press, Wantagh, Ny 2004
Way of continuous check of knowledge in the course of semester
Continuous elaboration and submission of individually assigned programs in the required deadline and quality.
E-learning
Other requirements
At least 70% attendance at the exercises. Absence, up to a maximum of 30%, must be excused and the apology must be accepted by the teacher (the teacher decides to recognize the reason for the excuse).
Tasks assigned on the exercises must be hand in within the dates set by the teacher.
Prerequisities
Subject has no prerequisities.
Co-requisities
Subject has no co-requisities.
Subject syllabus:
Lecture:
1. Introductory lecture. Recommended literature.
2. Climate of cities, settlements and buildings.
3. Pipe hydraulics.
4. Water supply. Water connection. Internal water supply.
5. Fire water mains.
6. Sewerage. Sewer connection. Internal drains.
7. Typology of hygienic devices.
8. Gas pipeline. Gas pipelines. Internal gas pipeline.
9. Installation units.
10.Ventilation and air conditioning.
11.Preventive ventilation.
12. Air conditioning.
13.Hair systems.
14.Ecology and energy savings. Unusual energy sources. Hysolar technology.
Exercises:
1. Recommended literature and standards.
2. Determination of the environment. Space layout of technical equipment networks.
3. Water supply. Water connection. Water fittings.
4. Water supply. Internal water supply. Calculation of internal water supply.
5. Water supply.
6. Sewerage. Sewer connection. Furnishing items.
7. Sewerage. Internal drainage system. Principles of Design and Calculation of Internal Sewerage.
8. Gas pipeline. Gas connection. Gas appliances.
9. Gas pipeline. Internal pipeline - design principles.
10.Gas pipeline. Internal pipeline - Dimensioning of the internal gas pipeline.
11.Ventilation and air conditioning. Types of fans.
12.Ventilation and air conditioning. Calculation of air exchange in hygienic equipment according to hygienic regulations.
13.Ventilation and air conditioning. Ventilation systems.
14.Ventilation and air conditioning. Design of a small air-conditioning system.
15. Evaluation of the project.
Project:
A. Situation
1st Technical report of the building with the sign and a description of each room.
2nd Situation.
B. The water supply project
3rd Technical report of the project of water supply and water connections. Determination
consumption of water by n.9/73, description of fixtures and so on.
4th Floor plan of typical floor (1.NP) - riser and connecting pipes, electrical.
subjects.
5th Ground floor (1st floor) - horizontal distribution of cold and hot water connections
connections.
6th Vertical section of water pipe connecting the riser.
C. Sewerage Project
7th Technical Report project, drainage systems and sewers.
8th Floor plan of typical floor (1.NP) - waste, and vent pipe connection.
9th Ground floor (1st floor or foundation)
10th Vertical section of exhaust pipe ventilation sewerage and vertical
section of storm sewer.
11th Longitudinal section of the main branches of a down pipe sewage system.
D. Gas Pipeline Project
12th Technical report of the project pipeline and the internal gas connections.
13th Typical Ground Floor - gas pipes and connecting pipes.
14th Ground floor (1st floor or 1.NP) - horizontal distribution, connection of gas, HUP.
15th Isometry gas.
Conditions for subject completion
Occurrence in study plans
Occurrence in special blocks
Assessment of instruction