229-0158/02 – Project Seminary of Building Services I and Building Services II (PC)
Gurantor department | Department of Building Environment and Building Services | Credits | 7 |
Subject guarantor | Ing. Petra Tymová, Ph.D. | Subject version guarantor | Ing. Petra Tymová, Ph.D. |
Study level | undergraduate or graduate | Requirement | Compulsory |
Year | 3 | Semester | summer |
| | Study language | Czech |
Year of introduction | 2009/2010 | Year of cancellation | |
Intended for the faculties | FAST | Intended for study types | Bachelor |
Subject aims expressed by acquired skills and competences
The goal is to capitalize on knowledge gained from the TZB I - Plumbing pipes and gas equipment.
Teaching methods
Project work
Summary
This course leads the student to use, but also to further develop its expertise in the field of sanitary and gas installations.
Compulsory literature:
David V. Chadderton - Building Servicces Engineering, London , 2007
F. Hall, R. Greeno – Building Services Handbook, Oxford, 2011
David E. Watkins – Heating Services in Buildings, Oxford 2011
G.J. Blower – Plumbing Mechanical Services, Essex 2006
Recommended literature:
John Canivan: How to Build a Solar Hot Water System, Sunny Future Press, Wantagh, Ny 2004
Way of continuous check of knowledge in the course of semester
E-learning
Other requirements
At least 70% attendance at the exercises. Absence, up to a maximum of 30%, must be excused and the apology must be accepted by the teacher (the teacher decides to recognize the reason for the excuse).
Tasks assigned on the exercises must be hand in within the dates set by the teacher.
Prerequisities
Co-requisities
Subject has no co-requisities.
Subject syllabus:
Project sanitary facilities:
1st Situation
• drawing connections, water supply, sewerage and gas (individual resources)
• location HUV, HUP, placing sewer inspection chambers
• drainage of paved surfaces
• scale 1: 200 or 1:250
2nd Water supply project
• technical project report of water supply and water connections
• Attachments - determination of water requirements, design and assessment of water supply, list of fixtures
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection and risers VV
• Floor plans (scale 1:50)
showing the horizontal distribution VV, connection attachments
• axometrie developed or cut R & D (scale 1:50)
(Including water connections)
3rd Internal drainage project
• The technical report of the project drainage systems
and sewers
Annex - set the calculation of rain runoff and sewage plants, design and assessment of internal drainage, fixtures list
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, waste and ventilation pipes VK
• Floor plans and foundations (scale 1:50)
showing a down pipe VK connection connections
• vertical sections of the sanitary sewer system (scale 1:50)
(Waste and connecting pipes)
• vertical sections of storm sewer (scale 1:50)
• longitudinal section of the main branch and side branches of a down sewage pipes and storm drains (scale 1:50)
4th Internal pipeline project
• Internal technical report of the project pipeline and gas connections
Annex - determining the design of gas, design and assessment of the internal pipeline, a listing of fixtures, fittings, according to the classification of flue
• Floor plans of typical (1.NP, 2.NP; scale 1:50)
showing the connection, Riser VP
• Floor plans (scale 1:50) showing the horizontal distribution VP connection connections
• isometric VP (scale 1:50)
(Including gas connections)
Develop a seminar paper on an assigned topic.
After consultation with teachers to apply the specified topic in the essay given project house.