542-0046/01 – Projekt and Production Planning (PPV)
Gurantor department | Department of Mining Engineering and Safety | Credits | 5 |
Subject guarantor | doc. Ing. Václav Zubíček, Ph.D. | Subject version guarantor | doc. Ing. Václav Zubíček, Ph.D. |
Study level | undergraduate or graduate | Requirement | Compulsory |
Year | 2 | Semester | winter |
| | Study language | Czech |
Year of introduction | 2019/2020 | Year of cancellation | |
Intended for the faculties | HGF | Intended for study types | Follow-up Master, Bachelor |
Subject aims expressed by acquired skills and competences
==============================================
Teaching methods
Lectures
Individual consultations
Tutorials
Summary
Předmět je jedním z finálních ze souboru odborných předmětů ve studijním programu Těžba nerostných surovin. V návaznosti na legislativu k dané problematice se v něm detailně hodnotí přírodní podmínky ložisek, v širších souvislostech se řeší možnosti jejich otvírky a strategie dobývání, propočítávají se základní parametry dolu (lomu) a podrobně se probírají TH ukazatelé, charakterizující jeho celkovou koncepci. Další součástí přdmětu je tvorba všech provozních projektů a technologických postupů, které praxe vyžaduje, jako např. projket větrání, odstrňování prachu, projekt dopravmích cest atd.
Compulsory literature:
Recommended literature:
Additional study materials
Way of continuous check of knowledge in the course of semester
Semestrální projekt, prezentace projektu, zápočtový test, písemná a ústní část zkoušky.
E-learning
Other requirements
Eassy ,control test, presentation, project
Prerequisities
Subject has no prerequisities.
Co-requisities
Subject has no co-requisities.
Subject syllabus:
1st Legislation related to the preparation of production in mines and quarries and planning.
2nd Methods of evaluation focal relationships in a given mining area.
3rd Overview of mining coal underground mines issue, lignite, lignite, ore, non-ore and uranium.
4th Conceptual solutions essential for opening the mine and building its surface.
5th Strategy odrubávání stocks.
6th Possible ways of solving transport (horizontal, vertical and inclined).
7th Principles for effective preparation of production in the deep mines.
8th Contents of pre-production on the mines.
9th Determination of production capacity, time funds, mining and transport technology.
10th Solution discharging space, capacity, routing flow clears.
11th Drainage projects, the deployment of auxiliary machinery, assessment of rocks and soils.
12th Technical-economic indicators characterizing the overall concept of the mine or quarry.
13th Plans for opening, preparation and extraction, mining and technical plans and technological procedures, technical procedures. Breakdown of the mine or quarry project, respectively. its parts with special attention to economy and the project construction and operation of the organization
Conditions for subject completion
Occurrence in study plans
Occurrence in special blocks
Assessment of instruction