546-0084/03 – Special-purpose Water Management Storage Tanks (UVHN)

Gurantor departmentDepartment of Environmental EngineeringCredits6
Subject guarantordoc. Ing. Vojtěch Václavík, Ph.D.Subject version guarantordoc. Ing. Vojtěch Václavík, Ph.D.
Study levelundergraduate or graduateRequirementChoice-compulsory
Year1Semestersummer
Study languageCzech
Year of introduction2006/2007Year of cancellation2021/2022
Intended for the facultiesHGFIntended for study typesFollow-up Master
Instruction secured by
LoginNameTuitorTeacher giving lectures
VAC78 doc. Ing. Vojtěch Václavík, Ph.D.
Extent of instruction for forms of study
Form of studyWay of compl.Extent
Full-time Credit and Examination 3+2
Part-time Credit and Examination 9+6

Subject aims expressed by acquired skills and competences

The student who completes the course should be able: - to describe, discuss and deal with issues relating to small reservoirs used in water management, - prepare his/her own concept of a small water reservoir, - to defend his/her own proposal of a small water reservoir.

Teaching methods

Lectures
Tutorials
Project work

Summary

The subject is dealing with functional and constructional solution, building- up, servicing and working of the telic water-service reservoirs ( small water reservoir for fish cultural, industry, recreational, protecting etc. purpose ).

Compulsory literature:

[1] VÁCLAVÍK, V.: Hydraulic engineering works, Ostrava (2007), ISBN 978-80-248-1659-3. [2] Water Resources Technical Publication Series: Design of Small Dams, Government Printing Office, 1987.

Recommended literature:

[1] Matson, T.: Earth Ponds, Countryman Pr., 2003 [2] Gower, A.M.: Water quality in Catchment Ecosystems, John Wiley&Sons, New York, 1980

Way of continuous check of knowledge in the course of semester

Beginning with the second seminar in the semester, fulfilment of tasks are checked - the tasks relate to preparation of a semestral project of a small water reservoir. If the student does not fulfil the set tasks regularly, he/she will not be able to prepare the project.

E-learning

Other requirements

Completion of the project a small water reservoir.

Prerequisities

Subject has no prerequisities.

Co-requisities

Subject has no co-requisities.

Subject syllabus:

1. Introduction - classification, purpose and meaning of the reservoirs. Specific features. Relations in the context of a local region. Links to superior water management systems. History, current situation and forecast for future construction. Economic aspects of tank operation. Environment issues. Property law and legislative issues. 2. Designing and constructions - selecting a location and position for the reservoir. Influence of the environment. Water need (loss, safety, minimum flow rate, supply and retention flow rate), associated investments. Survey - hydrobiology, hydrogeology and pedology. Bearing. Measuring and observations. 3. Organisation and progress of constructions. Site supervisor. Technology process of construction (process in general, construction of filled and concrete dams and facilities). Protection of the site against floods. 4. Designing of damps – classification by functions, layout, construction materials, transversal profile and construction of the dam. Static solution, sealing components (leakage curve), proposal of a filter, anchoring. 5. Methods used for reinforcement of upstream and downstream slopes. Improvement of reservoir bottoms (permeability, sealing, using of materials from the bottom). Improvement of reservoir embankment. Ground shaping (landscaping). Pollution protection. 6. Reservoir facilities – water inlet and water outlet (in terms of reservoir stratigraphy) . Outlet facilities (types, functions, machines). Overflows (types, capacity, calculation of crests, combined and multiple facilities – safety overflows). 7. Specific features of construction, erection and operation - fish breeding reservoirs (ponds), erosion protection reservoirs and melioration lakes. 8. Specific features of construction, erection and operation - compensatory reservoirs (equalizing and supply reservoirs, feeding reservoirs, liquid manure tanks, storage tanks), homogenising and water management reservoirs (incl. those that can be used for fish breeding and underground tanks). 9. Specific features of construction, erection and operation - rain water head ponds, rain water cisterns, fire water tanks (for fire safety. Biological tanks - purification processes. Calculations and designs. Layout, facilities and operation. 10. Specific features of construction, erection and operation – protective and catch basin and reservoirs (flood release basins and polders). 11. Lakes for recreation – required quality and facilities, open air pools incl. swimming baths and bathing pools, reservoirs that might be used for recreation, river sections for recreation (facilities and equipment). Decoration lakes and reservoirs in housing developments (such as fountains) 12. Sludge beds and sedimentation tanks - types (depending on stored materials, permanent and periodic tanks). Sluicing - process and methods. Removal of water. Specific features of facilities. Sedimentation sumps and sludge dewatering tanks. 13. Specific features of construction, erection and operation - construction of embankments (increasing embankment height, hydraulic fill dams). Excavation of sludge. Reclamation of sludge. 14. Sediments in reservoirs – reasons for sediments. Composition and failures. Desludging – removal of sediments (survey, analyses, excavation, transport). Costs and environment aspects. Reconstruction of tanks. 15. Designing of tanks. Operation and handling rules. Master plan of water reservoirs and lakes in the Czech Republic. Framework plan of seminars: 1. Zadání semestrálního projektu malé vodní nádrže. 2 - 3. Výkres situace. 4. Výkres podélného profilu hráze. 5. Výkres podélného profilu nádrže. 6. Výpočet objemu nádrže. 7 - 8. Výkres vzorového příčného profilu hráze. 9 - 10. Výkres sdruženého funkčního objektu. 11 - 12. Výkresy příčných profilů hráze. 13. Zpracování technické zprávy. 14. Kontrola projektu a udělení zápočtu. 1. Specification of a semestral project for a small water reservoir. 2-3. Layout drawing. 4. Drawing of a longitudinal profile of the embankment. 5. Drawing of a longitudinal profile of the reservoir. 6. Calculation of reservoir volume. 7-8. Drawing of a model transversal profile of embankment. 9-10. Drawing of a combined facility. 11-12. Drawing of transversal profiles of embankment. 13. Preparation of a technical report. 14. Checking of a project and granting of credits.

Conditions for subject completion

Full-time form (validity from: 1960/1961 Summer semester, validity until: 2011/2012 Summer semester)
Task nameType of taskMax. number of points
(act. for subtasks)
Min. number of pointsMax. počet pokusů
Exercises evaluation and Examination Credit and Examination 100 (100) 51 3
        Exercises evaluation Credit 33 (33) 0 3
                Other task type Other task type 33  0 3
        Examination Examination 67 (67) 0 3
                Written examination Written examination 20  0 3
                Oral Oral examination 47  0 3
Mandatory attendence participation:

Show history

Conditions for subject completion and attendance at the exercises within ISP:

Show history

Occurrence in study plans

Academic yearProgrammeBranch/spec.Spec.ZaměřeníFormStudy language Tut. centreYearWSType of duty
2020/2021 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2020/2021 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2020/2021 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2019/2020 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2019/2020 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2019/2020 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2018/2019 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2018/2019 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2018/2019 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2017/2018 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2017/2018 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2017/2018 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2016/2017 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2016/2017 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2016/2017 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2015/2016 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2015/2016 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2015/2016 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Most 1 Choice-compulsory study plan
2014/2015 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2014/2015 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2013/2014 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2013/2014 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2012/2013 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2012/2013 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2011/2012 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2011/2012 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2010/2011 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2010/2011 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2009/2010 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2009/2010 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2008/2009 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan
2008/2009 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management K Czech Ostrava 1 Choice-compulsory study plan
2007/2008 (N2102) Mineral Raw Materials (2102T006) Water Technologies and Water Management P Czech Ostrava 1 Choice-compulsory study plan

Occurrence in special blocks

Block nameAcademic yearForm of studyStudy language YearWSType of blockBlock owner

Assessment of instruction



2020/2021 Summer
2019/2020 Summer
2018/2019 Summer
2017/2018 Summer
2016/2017 Summer
2015/2016 Summer
2014/2015 Summer
2012/2013 Summer