546-0382/01 – Organization and Technology of Development (OTV)
Gurantor department | Department of Environmental Engineering | Credits | 1 |
Subject guarantor | doc. Ing. Tomáš Dvorský, Ph.D. Paed.IGIP | Subject version guarantor | doc. Ing. Tomáš Dvorský, Ph.D. Paed.IGIP |
Study level | undergraduate or graduate | Requirement | Choice-compulsory |
Year | 1 | Semester | winter |
| | Study language | Czech |
Year of introduction | 2006/2007 | Year of cancellation | 2014/2015 |
Intended for the faculties | HGF | Intended for study types | Bachelor |
Subject aims expressed by acquired skills and competences
Describe the basic problems of water management structures. To characterize the basic legislation
Teaching methods
Tutorials
Summary
Subject deal with problems build - up water utilization cadastre constructions
and arrangement - working progress and manners, organization build - up,
merging and transaction constructions, assembly arrangement, transaction
installation and progress completing washing.
Compulsory literature:
Spence, W. P.: Construction materials, Methods and techniques. Delmar ITP, 1998.
Mehta,M., Scarborough, W.,Armpriest, D. Building Construction: Principles, Materials, & Systems, 2nd Edition, 2012, ISBN-10: 0132148692, ISBN-13: 978-0132148696
Stein, B.: Building technology, 2nd edition. Wiley, 1997.
Recommended literature:
Ching,F. D. K., Adams,C.: Building Construction Illustrated, 2000, ISBN-10: 0471358983, ISBN-13: 978-0471358985, Edition: 3rd
Punmia, B. C., Jain, A. K., Building Construction, Laxmi Publications, 2005), ISBN-10: 8170080533, ISBN-13: 978-8170080534
Merritt, F.S., Building Design and Construction Handbook, Sixth Edition, McGRAW-HILL, 2001.
actual professional publications
Way of continuous check of knowledge in the course of semester
Kontrola formou diskuze k prbrané látce.
E-learning
Other requirements
Other requirements are not
Prerequisities
Subject has no prerequisities.
Co-requisities
Subject has no co-requisities.
Subject syllabus:
1. The production processes in construction. Legislation for the construction of buildings (in Following the PA-16-documentation of buildings, water management and professional supervision supervision, acceptance, etc.)
2. Construction management, installation, and individual works. Safety in construction and risk.
3. Construction project organization (purpose, content, processing), construction schedule and the project construction and installation process (the principles of network graph, etc.).
4. Site preparation-taking site, sounding, surveying network points and
surveying work.
5. Pre-production preparation and production structures, preparatory work (reading of topsoil, modified base joints, supporting structures, demolition work).
6. Implementation of the ground work - manual and mechanical trenching (used mechanisms) excavation trenches, moving soil.
7. Earthworks cont. - Embankments and earthworks, fills and fillings, natural filters, compaction grouting, excavation in the water, the river closure.
8. Foundation engineering - the types of foundations, methods of creation, the foundation elements structures - the underlying soil and holiday stress.
9. Foundation engineering cont. - Slope pit, pits, grooves, curbing (grooves, pits
types of shoring, earth pressure on the sheeting, risks), drainage and foundation pits grooves.
10. Foundation engineering cont. - Sheet pile wall, pile driving, slopes and walls
dam, foot slopes, establishment of special circumstances (Landslide area
undermining, shrink clay, muddy soil, frozen soil).
11. Construction of water networks - water supply and sewerage installation
pipe laying and drainage modification, installation of machinery and electrical equipment.
12. Waterproofing - types of insulation, pressure isolation, procedure implementation, waterproof concrete.
13. Concrete work - concrete preparation and transport, storage and compaction, installation reinforced concrete structures, concrete under water and frost.
14. The work of masonry, carpentry and scaffolding, roof structure and cladding,
internal finish (plaster, paints, tiles, floor tiles).
15. Finishing work, tests - strength, compaction, tightness, pressure,
operating testing, acceptance, trial operation.
Conditions for subject completion